F(14-1): Complete installation and testing of refurbished D-Site Rectifier Firing Generators The refurbished D-site rectifier firing generators will be installed and tested to support integrated systems testing of the D-site FCPC power systems. D(14-1): Complete the Multi-Pulse Thomson Scattering (MPTS) diagnostic in-vessel hardware modifications To support post upgrade operation, the MPTS diagnostic in-vessel hardware modifications will be completed to be ready for a system test and calibration of the diagnostic.
|
Program > Milestones >